判断题
外贸业务员
2012-07-30
As per UCP 600, the words “to”, “till”, “from”, “between” when used to determine a period of shipment include the date or dates mentioned, the words “before” and “after” exclude the date mentioned.( )
参考答案
1
答案解析
暂无解析