专业英语
单选题The responsible period of the carrier for the loss of or damage to the cargo as well as delay in delivery under CMR Convention is between ( ).
A.the Port to Port
B.the Door to Door
C.the Rail to Rail
D.the time the carrier taking over the goods and the time of delivery
参考答案:D进入在线模考
暂无解析
你可能感兴趣的试题
2For a Supply Chain to realize the maximum strategic benefit of logistics, the full range of functional work must be ( ).
A.managed
B.integrated
C.transported
D.supplied
3The rate of FAK refers to ( ).
A.freight for class
B.freight of all kinds
C.weight/measure rate
D.all inclusive rate
